06-C. Repair report
Location: DV Primary Residence
Marking: OBJ Echo Alpha
Object: Document
Type: Physical
Operation Gathered: OP 06 - 2024/05/18
We used the new Strontium-90 RTG core which should allow it to charge up when the compound loses power however while the full range of an operational device is 10KM we have been unable to fully repair it back to that functionality, the most we theorise this repaired device can do is 1KM (10% effectiveness).
<Tons of gibberish technical details>